Friday, November 12, 2010

Lecture notes - structure



1. Charles-Edouard Jeanneret-Gris (corb) stole our hotel bath idea.  


2. our cantilever is totally doable.  





2. design formulated based on structure


Friday, November 5, 2010

Tweaked model

This is a modified version of what was presented at midterm.  This new model expands into 2 to 3 stories, and widens to up to 60 feet to fit program.  



Thursday, November 4, 2010

Midterm Review

pushing the project forward.

- modulate thickness of strips according to program

- rearrange program

- increase room count (2 - 3 stories / denser rooms)

- some sense of structural integrity 

- designing site

- designing bath

- rethink program (shift from gym to spa, to work with bathhouse)

then again, some of the suggestions were thrown out when my professor and reviewers were drinking





Wednesday, October 27, 2010

new strategy?

a modification of our original layout so that there are more dramatic shifts in spaces and experience.  it also incorporates the idea of using a different language that emulates the site to house more permanent fixtures such as the monastery and baths.  



Saturday, October 23, 2010

test models

these are test models for alternatives to 3d printing.  we wanted to first try steaming basswood to make our 1/32nd model, but the slope and curvature of our building was too gradual to control using this method.  the second study used museum board and was slit in transition points to make the curves.  this was somewhat more successful but i'm still wondering how do we should create the wall surfaces.  going to try out hand cutting vinyl first, then 1 ply museum board.  





Friday, October 22, 2010

Vivian Lee - ramps ramps ramps

Idea of universal Design - design of products and environments to be usable by all people, to the greatest extent possible.



The process of embedding choice for all people in the things we design.
  • Choice involves flexibility, and multiple alternative means of use and/or interface.

  • People includes the full range of people regardless of age, ability, sex, economic status, etc.

  • Things include spaces, products, information systems and any other things that humans manipulate or create.





Carpenter Center
by Le Corbusier



Student Centre NY
by Bernad Tschumi Architects





Villa Bordeaux
by Rem Koolhaas



Monday, October 11, 2010

Schematic Design

Over the weekend, we as Team Asia began reassessing our early massing models and picking out aspects we thought had the most potential.

SITE: edge of the peninsula as a strategic placement to redefine the edge condition, capitalize on natural daylight, and as a strategy to create access to the water.  

LAYOUT: modified courtyard, taking in consideration the monastery and eco resort is a place of reflection, courtyard layouts can be used to create communities within communities while allowing more rooms to have views out into the quarry in less edge real estate.  

EXPERIENCE: linear movement through connected courtyards to create a dynamic procession onto the waterfront.  using a single loaded corridor that weaves between courtyards and the "natural landscape" to achieve this experience.  


Saturday, October 9, 2010

Lecture 7 (Jen Maigret)

Jen's lecture on sustainability was centered around utilizing site and sustainability as design opportunities.  It makes me question about our own site in the quarry, and what opportunities have.  The site itself is limestone and bedrock, is there a reason here to slow or excavate to include systems to slow water flow?  I'm thinking that the primary opportunity is the building itself, within it's roof planes, walkways, sections that are already being excavated or built for the building itself rather that digging for planting alone.  

Friday, October 8, 2010

Market Research

Market analysis of our studio site, Kelleys island indicated limitations due to the seasonality and limited access to the island in the winter months except by air.  So the idea behind program is to open up access to the monastary during the winter months for use as an religious retreat.

Another issue was deciding square footage of the site.  Looking at RS means there appears to be a sweet spot for construction methods between 3 - 4 stories for the most reasonable cost per square foot, primarily due to the cost of cooling equipment and the need to elevators.  So we've decided that there would be a target square footage of 20,000 square feet per floor, adding up to 60,000 - 80,000 square feet in total.